Last weekend:
- Painted the kitchen cabinents doors and drawer fronts.
- Finished the last piece of trim! Returned all the extras. Hallelujah!
- Ordered the knotty pine caulk. Yes, if you didn't know there are 30-50 different colors you can buy. The brand is Colorflex. Google it. One tube cost $33 with shipping and was unavailable from Amazon. Perfect color match!
- Ordered the bath accessories.
- Stained and installed the kitchen counter backsplash.
- Bought and installed the 24W LED lights above the bathroom sink; Installed the specialty LED bulbs in the ceiling fan.
- Painted the bath and kitchen cabinets with high gloss white.
- Rebuilt two drawers to accommodate the drawer face.
- Removed chop saw, vacuum, remove floor coverings.
- Prime the wardrobe door, paint it with high gloss white, apply cork decorations and full length mirror.
- Caulk the holes in the installed trim.
- Seal the trim with polyurethane.
- Install Delta faucet on the Moen sink. Attach supply lines.
- Install the Rev-a-Shelf double drawer under the sink, install the foil and cling wrap holder, towel hook, and toilet paper holder. I love the Moen brurshed nickel look!
- Install the veggy basket and magnetic knife holder.
- Drill the holes for the spice rack shelves.
- Install back splash above the range.
- Install the drain lines (exterior plumbing)
- Test fixtures and drain lines (check for leaks)
- Keep adding up receipts
- Install Kitchen Cabinent doors and drawer fronts.
- Install the handles and knobs on the kitchen cabinents.
- Build and install towel shelf above toilet. Trim out inverter, if possible.
- Install the fold-up dining room table.
- Wash windows, inside and out. Consider installing screens.
- Stock refrigerator with Fat Tire.
- Figure out what I forgot to put on any of the lists.